Concrete driveway quote comparison

Compare a driveway quote from demolition through drainage and the finished surface.

Start with the questions below. Written quotes are required to compare totals; this page does not estimate a market price.

Check what each quote includes

Leave anything unclear as “Ask.” Choose “Extra” to add a separately priced item to that quote’s budget. Do not also put it in the general left-out costs below.

Existing driveway removal

Identify asphalt or concrete, thickness assumptions, hauling and any buried obstructions.

Excavation and base

Record the designed base and the allowance for soft spots or unsuitable material.

Drainage and grades

Ask how the driveway meets the garage, sidewalk and street without directing water where it should not go.

Concrete and reinforcement

Keep the specified mix, reinforcement, thickened edges and ordered volume with the plan.

Finish and joints

Name the texture, decorative work, control joints and curing responsibilities.

Access and restoration

Record pumping, traffic control, landscape repairs and restrictions on using the driveway.

Put your quotes side by side

Add only costs left out of each written quote.

Quote A
Costs outside the quote & your reserve

This is money you set aside. It is not a contractor charge or a recommended percentage.

Enter a quoted price

Quote B
Costs outside the quote & your reserve

This is money you set aside. It is not a contractor charge or a recommended percentage.

Enter a quoted price

A price difference helps only after the work matches.

Nothing is sent to a contractor. Saving keeps these entries in this browser; downloading makes a text file.

Before asking for a price

Record the driveway outline, planned thickness, slopes, vehicle use and the connection to the street or garage.

What the total can tell you

A slab-volume result does not approve a vehicle-bearing section or drainage design. Confirm those details before comparing a price per square foot.

The budget adds the quoted price, separately priced Extra items, other costs left out and any tax not already included. Your chosen reserve is added to that subtotal. Treat every “Ask” row as work that is not yet confirmed as included. Get the answer in writing before comparing totals.