Hardwood flooring calculator

Cartons = floor area plus extra ÷ the coverage on the carton, rounded up: a 12 × 10 ft room in 6 in boards is 120 sq ft, or 7 cartons of 20 sq ft with 10% extra. Counting every cut board as a whole one, the layout needs 8: order the larger.

Your measurements

Example

Use the unit shown for each box, or type another one: 12 ft 6 in, 150 in, 3.8 m and 600 mm all work, as do the marks on a tape measure.

Room 1
Details Package sizes, prices and materials

Example: replace these measurements

Your material list

8 cartons by cut layout, the larger count (7 by area)

120 sq ft measured

Your measured layout
144 × 120 ininside perimeter gapsPlanks run along room length
First room, turned so the planks run across. Rows show your board widths and the offset of alternating rows. Each cut uses a new plank; offcuts are not reused. Very large rooms show the first 1,800 planks.

Your shopping list

  • 8 cartons by cut layout, the larger count (7 by area)
Already have some? See what it covers

Quantities and package details
Net room area
120 sq ft
Area with allowance
132 sq ft
Coverage bought beyond the floor area
20 sq ft
Cartons by cut layout
8 cartons; offcuts not reused
Whole plank positions
50
Cut plank positions
20
Offcut area before reuse
20 sq ft
Room 1
120 sq ft · 20 rows · 70 plank positions
Room edges, for base shoe or quarter round
44 ft, less the doorways (none if the baseboard comes off and goes back over the gap)
Transition strips
1 strip, one a doorway
End joints in neighboring rows
16 in apart
Shortest piece at a row end
16 in
6-inch width positions
70
Finish containers
No site-finish coats entered
Fastening points before the end-of-board rule
Enter the fastening interval
Price of the cartons to order
Enter your unit price

Area cartons and the conservative cut allowance answer different questions. The cutting layout follows the room’s shape and any area left uncovered that you outline by its corners; an excluded area typed in square feet changes only the area count.

The calculation

  1. 120 × (1 + 10/100) ÷ 20, rounded up = 7
  2. Cut allowance: 70 plank positions with 20 sq ft offcut; no reuse assumed.

Common questions

How much hardwood flooring do I need?

Measure each room, add your extra for cuts and divide by the square feet in a carton, rounding up. The cut layout gives a second figure that counts each cut board as whole: order the larger, which the answer leads with. Random-length bundles vary, so check the carton label.

Can I plan mixed-width boards?

Yes. Choose repeating mixed widths and enter the three face widths. The calculator counts the rows of each width across the room.

How much finish do I need for site-finished floors?

Enter the finish coats and the coverage on the finish label. Prefinished flooring needs no site coats; leave the coats at zero.

How to plan the quantity

Mixed-width mode repeats the first, second and third board widths. It counts each width separately across the room. This is a specified repeating layout, not a random-length carton optimizer.

Length and stagger use an equal-length example. For assorted lengths, cartons still follow their label coverage; confirm the cut allowance against the actual bundle mix.

Site finish is counted only if you enter coats and product coverage. Factory-finished flooring may need no site coating; the tool does not choose it.

For an L-shaped floor, enter the widest length and width, then the size of the missing top-right corner. The plank layout removes that corner in either plank direction and allows the perimeter gap at its inner edges. A U, a T or any outline typed by its corners is laid the same way: rows run across the whole floor, the gap follows every wall and every uncovered area you outline, and each plank is cut where the floor ends. An excluded area typed in square feet affects the area order only.

Before you order

  • Moisture, acclimation, grade, species, fastening and the installation method belong to the chosen product and accepted plan.
  • Parquet and complex patterns need their own measured layout; area cartons alone cannot specify cuts.

Have prices moved?

Lumber cost 8.7% more in September 2026 than a year earlier (Bureau of Labor Statistics producer price index, preliminary).

Every building material we track, month by month, with the change in a year.

What owners paid: the typical flooring, carpeting, paneling and ceiling tile job cost $3,000 in the 2023 Census survey.

Your project

My project

Saved in this browser only; nothing is sent to us. Choose “Save in this browser” in any calculator or worksheet to add it here.

Choose a calculator