Chain link fence cost calculator: Your quotes

Compare fence systems, gates and ground work against the same measured layout.

Start with the questions below. Written quotes are required to compare totals; this page does not estimate a market price.

Check what each quote includes

Leave anything unclear as “Ask.” Choose “Extra” to add a separately priced item to that quote’s budget. Do not also put it in the general left-out costs below.

Fence system

Identify wood, chain link, vinyl or metal with its height, finish and component specification.

Removal

List the existing fence, posts, concrete and disposal work that must be removed.

Post foundations

Ask what ground assumptions, depth, foundation type and obstruction allowance are included.

Gates

Record opening dimensions, leaves, hinges, latches, posts and any automation or electrical work.

Grade and access

Identify slopes, steps, retaining conditions, restricted access and utilities to be located.

Finish and site repairs

Include coatings, disturbed ground, debris removal and the final boundary layout.

Put your quotes side by side

Add only costs left out of each written quote.

Quote A
Costs outside the quote & your reserve

This is money you set aside. It is not a contractor charge or a recommended percentage.

Enter a quoted price

Quote B
Costs outside the quote & your reserve

This is money you set aside. It is not a contractor charge or a recommended percentage.

Enter a quoted price

A price difference helps only after the work matches.

Nothing is sent to a contractor. Saving keeps these entries in this browser; downloading makes a text file.

Before asking for a price

Keep solid runs, corners, gate widths, height, grade changes and property-boundary information together.

What the total can tell you

Fencing and walls share one historical spending category. It does not establish a per-foot price for a particular fence system.

The budget adds the quoted price, separately priced Extra items, other costs left out and any tax not already included. Your chosen reserve is added to that subtotal. Treat every “Ask” row as work that is not yet confirmed as included. Get the answer in writing before comparing totals.