Concrete Calculator

Cubic yards = length × width × thickness in feet ÷ 27: a 12 × 10 ft slab 4 inches thick is 1.48 cubic yards, 1.56 with 5% extra, or 70 bags of 80 lb.

Your measurements

Example

Use the unit shown for each box, or type another one: 12 ft 6 in, 150 in, 3.8 m and 600 mm all work, as do the marks on a tape measure.

Details Package sizes, prices and materials

Example: replace these measurements

Your material list

70 bags of 80 lb

1.56 cubic yards of concrete

Or 94 bags of 60 lb, or 140 of 40 lb. Includes your 5% extra; 1.48 cu yd before extra.

Your measured layout
Length 12 ftWidth 10 ftThickness 4 in
Length and width run across the slab; thickness goes down through it. This measures quantity, not a recommended slab design.

Your shopping list

  • 70 bags of 80 lb
Quantities and package details
Before extra
1.4815 cu yd (40 cu ft)
With your allowance
42 cu ft
Cubic meters
1.1893
Bags of 80 lb
70
Same pour in other bags
94 of 60 lb · 140 of 40 lb
Weight of the bags
5,600 lb (2.8 US tons)
Edge forms
44 ft of form boards, as deep as the pour

Bags or a truck: 70 bags of 80 lb weigh 2.8 tons to lift and mix by hand. A ready-mix truck brings it mixed; ask the plant for its price per yard and its small-load fee, then compare. Delivery, pumping and waiting time are charged on top.

The calculation

  1. 12 × 10 × 0.3333 = 40 cu ft per rectangle
  2. 40 × 1 identical shapes = 40 cu ft
  3. 40 × (1 + 5/100) ÷ 27 = 1.5556 cu yd
  4. Edge forms: 2 × (12 + 10) = 44 ft

Not measured yet? Common jobs

A rough starting point, worked out with this calculator. Usual sizes and thicknesses; your plan and local code have the final word. 5% extra, 80-lb bags. Use a row to load its size into the calculator, then change it to your measurements.

Concrete for common home jobs
JobSizeCubic yards80-lb bagsBags or truckLoad
Fence post hole10 in wide, 3 ft deep0.063Bags
AC or generator pad3 × 3 ft, 4 in0.126Bags
Walkway3 × 20 ft, 4 in0.7835Bags
Shed slab10 × 12 ft, 4 in1.5670Either
Patio12 × 12 ft, 4 in1.8784Either
One-car driveway12 × 20 ft, 5 in3.89175Truck
Two-car garage floor20 × 20 ft, 4 in5.19234Truck

Common questions

How many bags of concrete make a cubic yard?

45 bags of 80-lb QUIKRETE Concrete Mix, 60 bags of 60 lb or 90 bags of 40 lb. A cubic yard is 27 cubic feet, and QUIKRETE gives 0.60, 0.45 and 0.30 cubic feet per bag.

Source: QUIKRETE Concrete Mix No. 1101 data sheet. Listed on the Sources page.

How much concrete do I need for a 10 × 10 slab 4 inches thick?

About 1.23 cubic yards before any extra: 10 × 10 × 4 ÷ 12 = 33.3 cubic feet, divided by 27. With 5% extra that is about 1.3 cubic yards, or 59 bags of 80 lb.

Source: QUIKRETE Concrete Mix No. 1101 data sheet. Listed on the Sources page.

How thick should a concrete slab be?

Most patios, walks and shed slabs are poured 4 inches thick, and driveways 5 to 6 inches. Your plan and local code have the final word. At 4 inches, one cubic yard covers 81 square feet.

How much gravel goes under a slab?

Many patios and walks sit on about 4 inches of compacted gravel; the ground and your plan decide. Measure the base as its own layer: 4 inches under a 10 × 10 ft slab is about 1.2 cubic yards of gravel.

Should I order ready-mix or bags?

Under about a cubic yard, bags; at two yards or more, a truck. In between, compare the two: a yard takes 45 bags of 80 lb, 3,600 lb to lift and mix by hand. Ready-mix plants add a fee for small loads, so ask for it with the price per yard. The result box says which side your pour falls on.

How to plan the quantity

Slabs, footings, walls and curbs use rectangular volume: length × width or wall height × thickness. Thickness is in inches. Columns and post holes use solid circular area × height; tube mode can subtract an inner diameter. Multiply identical sections without re-entering their measurements.

Tube volume uses the circular area, subtracting an inner circle for a hollow tube. Steps mode assumes solid steps on a level base: width times tread depth times riser height times the sum of the step numbers.

The extra percentage is your ordering choice. Enter the bag yield from your mix, or ask a ready-mix supplier about their minimum, delivery charge and order increment.

Before you order

  • This measures concrete only. It does not specify thickness, reinforcement, base preparation, drainage, strength or curing.
  • The steps model is solid, not a stair shell. Footing dimensions must come from the design and local ground conditions.

Have prices moved?

Ready-mixed concrete cost 2.3% more in August 2026 than a year earlier (Bureau of Labor Statistics producer price index, preliminary).

What owners paid: the typical driveway and walkway job cost $2,914 in the 2023 Census survey.