How much concrete do I need? Yards, bags and when to order a truck

Multiply length by width by thickness, divide by 27 for cubic yards and add 5 to 10% extra. A cubic yard takes 45 bags of 80 lb, 60 of 60 lb or 90 of 40 lb. Under about a yard, bags make sense; at two yards or more, order a truck.

Walkways are poured at least 4 inches thick and patios 3 1/2 to 4 inches; city rules for driveways set a minimum, 4 inches in some towns and 6 in others. At 4 inches, one cubic yard covers 81 square feet.

Try it with your numbers

Worked example

Example: a 12 × 10 ft slab, 4 inches thick, with 5% extra and 80-lb bags that make 0.6 cubic feet each.

This example gives 1.56 cubic yards of concrete.

Length 12 ftWidth 10 ftThickness 4 in
Length and width run across the slab; thickness goes down through it. This measures quantity, not a recommended slab design.
  1. 12 × 10 × 0.3333 = 40 cu ft per rectangle
  2. 40 × 1 identical shapes = 40 cu ft
  3. 40 × (1 + 5/100) ÷ 27 = 1.5556 cu yd
  4. Edge forms: 2 × (12 + 10) = 44 ft
Open the concrete calculator with this example

Other calculators for this job

Every step of a concrete project: measure, the list, what it costs and the quotes.

Bags per cubic yard

One cubic yard is 27 cubic feet. The bag counts use QUIKRETE 1101’s stated yields and are rounded up to whole bags; the last column is this guide’s 12 × 10 ft slab, 4 inches thick (40 cubic feet), before any extra.

BagMakesBags per cubic yard12 × 10 ft slab, 4 in
80 lb0.60 cu ft4567 bags
60 lb0.45 cu ft6089 bags
50 lb0.375 cu ft72107 bags
40 lb0.30 cu ft90134 bags

How thick? Concrete by project

Thickness changes the order a lot: at 4 inches a cubic yard covers 81 sq ft, at 6 inches only 54. The plan for your job and your building department have the final word.

ProjectThicknessSourceA cubic yard covers
Sidewalk or pathAt least 4 inQUIKRETE’s sidewalk instructions81 sq ft
Patio3 1/2 to 4 in, on about 4 in of compacted gravelQUIKRETE’s patio and slab instructions: 2 × 4 forms make a 3 1/2 in slab81 to 93 sq ft
Shed base or other small slab4 to 6 in, by the load it bearsQUIKRETE’s small-slab instructions54 to 81 sq ft
Floor slab in a houseAt least 3 1/2 in; below grade, on a 4 in base of sand or gravel unless the soil drains wellInternational Residential Code, R50693 sq ft
DrivewayAt least 4 to 6 in, as your city sets itCity rules differ: at least 4 in over 4 in of gravel in Des Plaines, Illinois; at least 4 in in Newark, Delaware; at least 6 in with welded wire in Davison, Michigan54 to 81 sq ft

Which bag mix?

Every one of these makes the same volume for the same bag weight: 0.60 cu ft for 80 lb, 0.45 for 60 lb, 0.375 for 50 lb and 0.30 for 40 lb, so the bag count above holds for any of them. The strength your slab or footing needs comes from your plan or your local code.

MixStrength at 28 daysSoonerWhat it is forBags
Concrete Mix (No. 1101)4,000 psi2,500 psi at 7 daysThe everyday mix for slabs, footings, steps, walks and post footings, 2 in thick or more40, 50, 60 and 80 lb
5000 High Early Strength (No. 1007)5,000 psi1,500 psi at 1 day; walk on it after 10 to 12 hoursGains strength fast, which suits cold weather and a slab you need back soon50, 60 and 80 lb
Crack Resistant (No. 1006)4,000 psi2,500 psi at 7 daysSynthetic fibers for less shrinkage cracking, and air entrained to stand up to freezing and thawing50, 60 and 80 lb
Fast-Setting (No. 1004)4,000 psiSets in 20 to 40 minutes; 1,000 psi at 24 hoursPoured dry into a post hole and soaked: two 50 lb bags set a 3 in post in a 9 in hole 30 in deep. Wait 4 hours before loading the post or walking on a slab50 and 60 lb

What changes the order?

The same slab at greater thickness takes more concrete: at 6 inches it needs half as much again as at 4.

Only the input named below changes; the other example inputs stay the same.
Calculator inputResult from those inputs
Thickness (in): 31.17 cubic yards of concrete
Thickness (in): 41.56 cubic yards of concrete
Thickness (in): 62.33 cubic yards of concrete

Try your own measurements in the concrete calculator.

Measure each shape once

Split the pour into rectangles, circles and steps that do not overlap: a slab with a thicker edge is a slab plus a footing strip. Measure length and width in feet and thickness in inches. A 12 × 10 ft slab at 4 inches is 12 × 10 × 4 ÷ 12 = 40 cubic feet, or 1.48 cubic yards.

Length 12 ftWidth 10 ftThickness 4 in
The orange edge is the measurement this step is about, on the worked example above.

Add extra, then round up

Order 5 to 10% more than you measured: forms bow, the ground dips, and running short mid-pour leaves a weak seam. Round up to whole bags. Ready-mix plants sell in set steps and have a minimum load, so ask for both when you call.

Bags or a truck

An 80-lb bag makes about 0.6 cubic feet, so a cubic yard takes 45 bags weighing 3,600 lb. Under about a yard, bags are practical; at two yards or more a truck saves hours of mixing. Plants charge extra for small loads, so ask for that fee with the price per yard. Check the payload on the sticker in your truck’s door frame. It is the combined weight of the people and the cargo, so take off yourself, any passengers and anything else on board first: a pickup rated for 1,600 lb with a 200 lb driver has 1,400 lb left, which is 17 bags of 80 lb.

Before the truck comes

Tell the plant where the truck can park and how far the concrete has to travel; a pump or a line of wheelbarrows costs time and money. Ask how long the driver waits before charging and what happens to concrete left over. Reinforcement, the gravel base and curing follow your plan or local code.