Building material prices: what makers charge, month by month

U.S. producers charged 23.9% more for copper and brass pipe, sheet and rod in October 2026 (preliminary) than a year earlier, 6.4% more for lumber and 3.8% more for paint, according to the Bureau of Labor Statistics producer price indexes.

Figures changed ; checked . The Bureau’s release schedule puts November 2026 figures out on December 15, 2026. Producer price indexes, not dollars: how far each material’s price moved, not what a bag or a board costs at the store. Latest month October 2026; figures for July to October 2026 are preliminary. Every figure is in the CSV file.

The change in a year

Producer price index, October 2026 against October 2025
MaterialOctober 2026A year earlierChange in a yearSince January 2025
Copper and brass pipe, sheet and rodBLS WPU102502: Copper and brass mill shapes829.7669.8+23.9%+28.4%
LumberBLS WPU081: Lumber275.6259.1+6.4%+4.3%
PaintBLS WPU0621: Prepared paint449.1432.7+3.8%+6.9%
Ready-mixed concreteBLS WPU1333: Ready-mixed concrete394.8385.6+2.4%+1.2%
Asphalt roofing and sidingBLS WPU1361: Prepared asphalt and tar roofing and siding products365.9357.8+2.3%+4.1%
Gypsum products (drywall)BLS WPU137: Gypsum products486.5482.3+0.9%+1.4%
Ceramic floor and wall tileBLS WPU1344: Ceramic floor and wall tile139.2138.1+0.8%+2.8%

Every month, charted

Each material’s price index against January 2025 (= 100)
  • Copper and brass pipe, sheet and rod +28.4%
  • Lumber +4.3%
  • Paint +6.9%
  • Ready-mixed concrete +1.2%
  • Asphalt roofing and siding +4.1%
  • Gypsum products (drywall) +1.4%
  • Ceramic floor and wall tile +2.8%

Source: Bureau of Labor Statistics producer price indexes, not seasonally adjusted. The last four months are preliminary.

Month by month

Each index as the Bureau of Labor Statistics publishes it, newest month first. Index levels compare a material with itself over time; a higher number for one material than another means nothing. On a narrow screen the table scrolls sideways.

Producer price indexes, January 2025 to October 2026
MonthCopper and brass pipe, sheet and rodLumberPaintReady-mixed concreteAsphalt roofing and sidingGypsum products (drywall)Ceramic floor and wall tile
October 2026 preliminary829.7275.6449.1394.8365.9486.5139.2
September 2026 preliminary835.3282.7447.8395.3366.4483.4139.2
August 2026 preliminary823.4286.5447.5395.3373.9481.6139.2
July 2026 preliminary802.1291.0447.6394.9372.2481.6139.2
June 2026809.1280.2446.8396.0367.6477.5139.2
May 2026809.8281.2446.9394.1354.7475.1139.2
April 2026774.3280.4443.3392.9347.6480.4139.2
March 2026767.1270.8440.6391.0346.4479.5139.1
February 2026765.2272.1440.3390.1352.5480.7138.1
January 2026747.4265.3435.5390.2347.0480.3135.5
December 2025712.6259.1434.6386.2354.9480.2138.1
November 2025691.2259.5433.1383.9357.9480.8138.1
October 2025669.8259.1432.7385.6357.8482.3138.1
September 2025642.7259.8431.4386.3356.6482.1138.1
August 2025672.7266.3430.8386.4360.0484.0138.5
July 2025663.3264.2422.0386.0359.4483.4138.2
June 2025637.4266.6421.5387.4359.6483.7138.3
May 2025630.2269.7421.1387.5358.0483.9138.2
April 2025638.4274.5420.7386.1345.0485.1138.1
March 2025627.6278.4420.7388.5347.9487.4138.9
February 2025657.9269.4420.9389.5348.5485.5136.5
January 2025646.0264.3420.3390.3351.6479.8135.4

How we count

A producer price index measures how the prices U.S. producers receive change over time, before wholesale and store markups, delivery and tax, so it shows how prices move rather than what a homeowner pays. Imported goods are not counted. These are the Bureau of Labor Statistics’ monthly indexes, not seasonally adjusted. The Bureau marks the latest four months preliminary and may revise them; when it does, the figure here follows. The change in a year compares the latest month with the same month a year earlier. The copper row is the Bureau’s index for copper and brass mill shapes, which covers copper pipe and tube along with sheet, strip, plate, rod and bar; its separate index for pipe and tube skips months, the latest being April 2026.

The cost pages use the same indexes: the roofing, driveway, deck and flooring pages say how far their material moved. For what owners actually paid for the work, see what homeowners paid for home improvements.

How to cite this

The Well Planned Home, “Building material prices,” from U.S. Bureau of Labor Statistics producer price indexes, January 2025 to October 2026 (July 2026 to October 2026 preliminary). https://thewellplannedhome.com/building-material-prices

You may reuse this figure and chart with a link to this page. The data: building-material-prices.csv (7 materials, 22 months).

Source: U.S. Bureau of Labor Statistics, producer price indexes (each material links its series), listed on the sources page.