Cost to replace driveway: what owners paid in 2023

Driveways and walkways are combined, with no matched material, thickness or area.

The table shows the 2023 American Housing Survey’s median spending for owner-occupied homes. Projects were completed in the two years before interview; these figures are not current contractor prices.

National median for this survey category

$2,914

This historical median describes the category above, across different project sizes and scopes. It does not price a matching job at your address.

Material price trends, separate from your quote

These U.S. producer indexes track material prices over time. They are not store prices, labor rates or local installed costs. We do not use them to increase a historical project median.

Ready-mixed concrete

+2.3% from August 2025 to August 2026. Latest observation is preliminary and may be revised.

BLS producer index, not seasonally adjusted
PeriodIndex level, not dollars
August 2025386.359
August 2026395.186

U.S. Bureau of Labor Statistics · Updated . Use your quoted unit price in the material calculator; delivery, tax, preparation and labor remain separate.

Median spending in the survey’s metropolitan areas
Metro area2023 medianPublication state
New York City$3,709Published
Los AngelesNot publishedWithheld by Census
Chicago$4,500Published
Dallas$3,000Published
HoustonNot publishedWithheld by Census
Philadelphia$3,000Published
Washington DC$4,000Published
MiamiNot publishedWithheld by Census
Atlanta$4,000Published
Boston$4,000Published
San FranciscoNot publishedWithheld by Census
Phoenix$3,700Published
Riverside$4,663Published
Detroit$2,720Published
SeattleNot publishedWithheld by Census

Keep the category’s limits in view

The source category is “Driveways/walkways” under “Lot or Yard Additions and Replacements.” A median describes the middle of reported spending; it is not an average bid, a recommended budget or a standardized job.

Missing or withheld values stay unknown. They are not zero and are not filled using neighboring metros. The survey’s metro names and boundaries are retained; no county or ZIP estimate is inferred.

Before comparing your quotes

Are demolition, base, drainage, placement and restoration in the same scope?

Use the quantity calculator to record the measurements. Keep the actual quotes in the project’s comparison worksheet.